New Signs and Steel Kiosks Coming to Six Moab Trail Sites
Ready to ride or still deciding?
Reach out and we will get back to you fast. Call or text (913) 732-3001
The BLM plans new signs and clearer route markers at Bartlett Alcove, Tusher Tunnel and Uranium Arch starting in December, with steel kiosks at the Moab Rim, Cliffhanger and Steel Bender trailheads in 2027. Here is what it means for your next trip.
Some good news for anybody who has ever stood at a Moab trailhead squinting at a faded wooden board. The Bureau of Land Management plans to put new signs and steel kiosks at six off highway vehicle sites around Moab, with the goal of helping visitors find and stay on designated routes.
What is happening and when
According to The Times Independent, the work comes in two parts:
- Starting in December: Bartlett Alcove, Tusher Tunnel and Uranium Arch get updated signs explaining each site, new directional signs, and more clearly marked designated routes. At Tusher Tunnel, the BLM also plans a short trail segment to fix a hiking path visitors have worn around the site.
- Expected in 2027: The old wooden kiosks at the Moab Rim, Cliffhanger and Steel Bender trailheads get replaced with steel ones, along with updated trailhead signs. That project is still in design.
The new trailhead signs will include local maps and Leave No Trace guidance, plus information on geology, wildlife and visitor safety. The work is backed by Utah's OHV recreation grant program, the Foundation for America's Public Lands through a partnership with Polaris, and the Canyonlands Natural History Association.
A BLM spokesperson put the reason plainly: "outdated signage, informal travel routes and a lack of clear navigation have created challenges for visitors and increased the potential for impacts to cultural and natural resources."
What it means if you are heading to Moab
The BLM says you may run into short disruptions at individual sites while crews are installing, but expects little effect on access overall. If you are headed out to Tusher Tunnel or Uranium Arch this winter, just give the crews room and follow any temporary signs.
Tusher Tunnel is also the area where petroglyphs were defaced earlier this year, so clearer routes there are a welcome step. Better markers make it easier for everybody to do the right thing, and staying on the designated route is what keeps these places open to us.
My take
I love seeing OHV grant money and the off road industry going right back into the trails we use. Moab Rim, Cliffhanger and Steel Bender are trails a lot of folks dream about, and a solid kiosk with a good map at the start of the day goes a long way, especially for first timers. If you would rather have someone who knows the routes calling your line, our private guided Moab trips run February 5 to 7, 2027 and September 8 to 10, 2027 in your own Jeep.


